Ducks Unlimited Home
Support Ducks Unlimited
Ducks Unlimited Conservation
Ducks Unlimited & Hunting
Ducks Unlimited News
Members Area
Multimedia
DU Events
DU Waterfowl ID Gallery
California Projects
CA State Conservation Report 2008 (PDF)


M & T Chico Ranch / Llano Seco Fish Screen Facility

Short_Term/Long-Term Protection Project


Download/View


Public Meeting

Agenda (July 27, 2005 3:00PM-5:00Pm Glenn Phsasant Hall, 1522 Hwy 45 Glenn, CA)

PowerPoint Presentation   1   2  (Warning: Large file & long download time)

Summary Report


Historical Documents

January 1989
Upper Sacramento River Fisheries and Riparian Habitat Management Plan

November 1993
Restoring Central Valley Streams: A Plan for Action – California Dept. of Fish & Game (Warning: Large file & long download time)


April 14, 1995
Technical Memorandum from CH2MHILL to M&T Chico Ranch
re: M&T Chico Ranch Pump State Relocation Feasibility Study

June 1995
Butte Creek Water Supply and Fish Passage Study, Bureau of Reclamation

December 6, 1995
Draft Anadromous Fish Restoration Plan, A Plan to Increase Natural Production of Anadromous Fish in the Central Valley of California, U.S. Fish & Wildlife Service

April 1996
Finding of No Significant Impact/Mitigated Negative Declaration and Draft Environmental Assessment/Initial Study for the M&T / Parrott Pumping Plant and Fish Screen Project

May 21, 1996
Agreement for Relocation of M&T/Parrott Pumping Plan Providing for Bypass of Flows in Butte Creek, executed May 21, 1996

September 2001
Initial Study and Proposed Mitigated Negative Declaration – M&T Ranch/Llano Seco Ranch/City of Chico Sacramento River Water Intake Stream Channel Maintenance

June 21, 2001
Technical Memorandum from Stillwater Sciences to M&T Chico Ranch, Sacramento River Conservation Area Forum and California Department of Water Resources, re: Final Draft of M&T Ranch and Llano Seco Wildlife Refuge Pump Intake

March 17 – 19, 2004
Workshop #2 – Technical Review and Recommendation Workshop

    C. Steering Committee Charge

    D. Technical Memorandum #2 – MWH Americas
    1) Groundwater Model for Test Well
    2) Potential Water Supply Alternative – Scenarios 1-4
    3) Preliminary Cost Estimates, legal and economic discussion for Potential Water Supply
    Alternative – Scenarios 1-3
    4) M&T/Llano Seco Water Supply and Demand - City of Chico Wastewater Treatment
    Plant Impacts
    5) Optional Fish Screen Criteria

    G. Information
    1) National Marine Fisheries Service – Southwest Region Fish Screening Criteria for Anadromous Salmonids – January 1997
    2) State of California – Resources Agency, Department of Fish and Game Fish Screening Criteria – June 19, 2000

February 16 – 18, 2005
Workshop #3 – Project alternatives and Feasibility Workshop

April 24 – 25, 2006
Workshop #4 – Conceptual Model and Project Proposal

    C. Report 2 - 2-D Modeling to Evaluate Potential River Training Works at M&T Pumping Plant Sacramento River, RM 197.5
    1) Report
    2) Appendix A
    3) Appendix B


Last updated: 9/29/08  


©Ducks Unlimited, Inc. About DU | Contact  | Privacy | Jobs | FAQ's | Financials | Newsletter
 
Line-X